Oldskool 6,643 #276 Posted October 11, 2022 Man, oh man.. That's a palace of a pole barn. Lookin real nice Eric. 1 1 Share this post Link to post Share on other sites
ebinmaine 67,420 #277 Posted October 11, 2022 2 minutes ago, Oldskool said: palace of a pole barn Interesting verbiage 1 1 Share this post Link to post Share on other sites
WHX?? 48,814 #278 Posted October 11, 2022 Pics like that really show the amount of lumber in a build. 2 Share this post Link to post Share on other sites
Oldskool 6,643 #279 Posted October 11, 2022 I could see a ring of rocks off to the side with a flag pole in it for a Wheel Horse flag. 😁😁 1 1 Share this post Link to post Share on other sites
ebinmaine 67,420 #280 Posted October 11, 2022 3 minutes ago, Oldskool said: I could see a ring of rocks off to the side with a flag pole in it for a Wheel Horse flag. 😁😁 Excellent idea. Where might we put something like that? I'm going to need some sort of a drawing here. 1 3 Share this post Link to post Share on other sites
ebinmaine 67,420 #281 Posted October 11, 2022 Well people we got stairs!! The BBT and I had to go up and get view pics. Here's the best. Out the back. There will be 15 feet wide of windows of the 18 total. This is out the front. One 60" window on each side with a 4 or 5 foot solid wall in between. That wall will be opened up to a door AFTER the code inspection is passed. Out the front off to the left. Rail for the front door and the (3) 6 x 6 PT upper support posts are new today as well. 1 11 1 Share this post Link to post Share on other sites
ebinmaine 67,420 #282 Posted October 12, 2022 Builder dude told me yesterday they're shooting to be done BEFORE the end of October!! That's a pleasant surprise .. I thought we were aiming for more like third or fourth week of November. 4 4 Share this post Link to post Share on other sites
Handy Don 12,212 #283 Posted October 12, 2022 3 hours ago, ebinmaine said: Builder dude told me yesterday they're shooting to be done BEFORE the end of October!! That's a pleasant surprise .. I thought we were aiming for more like third or fourth week of November. No utilities or interior finishing saves a LOT of time 2 Share this post Link to post Share on other sites
ebinmaine 67,420 #284 Posted October 12, 2022 21 minutes ago, Handy Don said: No utilities or interior finishing saves a LOT of time Boy does it ever! The builder normally figures four to six weeks in an average year with average help and they've been running on the strong side of that. Coupled with delayed availability of product and the fact that this is a slightly larger building than normal I was figuring eight solid weeks for sure. Looks like it's going to be more like 5. The weather and ordering times have been very much in our favor so far. 1 2 Share this post Link to post Share on other sites
ebinmaine 67,420 #285 Posted October 12, 2022 Trim on the shed roofs today. Trina painted the front of that to match the top this evening. Also built the front wall. One window on each side. Solid wall in the center. After they're done we'll turn that solid wall into a door/doors(?). The back will be all windows with no solid wall in the center. 5 4 Share this post Link to post Share on other sites
sjoemie himself 3,068 #286 Posted October 13, 2022 Looking good! You'll have some really nice views up there. If the dojo thing doesn't work out you can always make two bedrooms up there and rent it out as a B&B 1 Share this post Link to post Share on other sites
ebinmaine 67,420 #287 Posted October 13, 2022 3 minutes ago, sjoemie himself said: Looking good! You'll have some really nice views up there. If the dojo thing doesn't work out you can always make two bedrooms up there and rent it out as a B&B Neither one of us likes other humans enough to do that. 🤪🤪🤪 1 6 2 Share this post Link to post Share on other sites
lynnmor 7,305 #289 Posted October 13, 2022 52 minutes ago, ebinmaine said: Neither one of us likes other humans enough to do that. 🤪🤪🤪 I will NEVER rent to another being again, there are some real losers out there. The last and final renter was a registered nurse and was the filthiest pig ever. 2 2 Share this post Link to post Share on other sites
ebinmaine 67,420 #290 Posted October 13, 2022 First thing this morning they started out by moving the people lift basket machine by way of trimming some insect nests so Trina could burn em. After that they cut all the boards for the back wall while they were waiting for the metal roofing to arrive. When the load got here they commenced to hanging steel. The lumber they moved to be under the roof will be used to make rolling doors. That's the intended task for tomorrow. Under cover. Out of the rain. 2 3 Share this post Link to post Share on other sites
19richie66 17,500 #291 Posted October 13, 2022 Man that is looking sweet. 1 1 Share this post Link to post Share on other sites
WHX?? 48,814 #292 Posted October 13, 2022 What Richie said...I've come to the conclusion that I would gladly give up the left on for a barn like that and the right one if Dan @Achto was to foot the bill... 1 3 Share this post Link to post Share on other sites
Achto 27,565 #293 Posted October 14, 2022 19 minutes ago, WHX?? said: the right one if Dan @Achto was to foot the bill... Right after I build a 60x120 for myself, I'll get to work on one for you. 2 1 2 Share this post Link to post Share on other sites
ebinmaine 67,420 #294 Posted October 14, 2022 1 minute ago, Achto said: Right after I build a 60x120 for myself, I'll get to work on one for you. That's fair. 2 Share this post Link to post Share on other sites
SylvanLakeWH 25,533 #295 Posted October 14, 2022 Wow… Do you need someone to clean the barn? Permanent like…? I’d take up no more than 150 sq ft max. Pay me with the occasional (ok routine) trail ride and a few adult beverages… I’d be good… promise… 1 4 Share this post Link to post Share on other sites
ebinmaine 67,420 #296 Posted October 14, 2022 1 minute ago, SylvanLakeWH said: Wow… Do you need someone to clean the barn? Permanent like…? I’d take up no more than 150 sq ft max. Pay me with the occasional (ok routine) trail ride and a few adult beverages… I’d be good… promise… You head right on over. We'll find a space for ya. Mebbe under the barn stairs? 3 Share this post Link to post Share on other sites
WHX?? 48,814 #297 Posted October 14, 2022 52 minutes ago, Achto said: Right after I build a 60x120 for myself, I'll get to work on one for you. Fair enough ... 60x120 enough space to grow my herd. I won't need one Any pasture included on that deal?!?! That's a gut buster Sylvia! ... 1 2 Share this post Link to post Share on other sites
Lee1977 6,656 #298 Posted October 14, 2022 (edited) Is therer a door above in the back with a beam above to lift in large equipment. You might need more Wheel Horse storage if you keep buying like you have been. Edited October 14, 2022 by Lee1977 3 1 Share this post Link to post Share on other sites
ebinmaine 67,420 #299 Posted October 14, 2022 29 minutes ago, Lee1977 said: Is therer a door above in the back with a beam above to lift in large equipment. You might need more Wheel Horse storage if you keep buying like you have been. There will be NO TRACTOR STORAGE in this building. The only tractors in this building at any time are either the snow horses waiting to be put to use or repairs and maintenance in the back shop. There will be a full size swing out door built into the front of the building. Possibly a small one in the back. Doubtful that we will use a crane or lift of any kind but that is open to change in the future. There's nothing that needs to be upstairs that we can't bring up manually. 1 Share this post Link to post Share on other sites
Sparky-(Admin) 21,315 #300 Posted October 14, 2022 Always love seeing the progress pics! Incredible build 1 1 Share this post Link to post Share on other sites