Jump to content
JCM

Industrial Piping Job

Recommended Posts

 
ebinmaine

Beautiful work Sir.

 

Hope your head heals well and soon.

At least you know it couldn't have done any internal head damage.

 

:hide:

  • Haha 4

Share this post


Link to post
Share on other sites
 
oliver2-44

Nice work!

 

  • Thanks 1

Share this post


Link to post
Share on other sites
 
The Tuul Crib

Wow lm impressed!

 

  • Like 1

Share this post


Link to post
Share on other sites
 
c-series don

Very nice work sir, I’m loving those clean solder joints! 

  • Like 2

Share this post


Link to post
Share on other sites
 
Sparky

Get your pics in before the insulators show up.

  Nice work right there !

  • Like 1
  • Haha 1

Share this post


Link to post
Share on other sites
 
Pullstart

So awesome!  What a monster chiller!  What kind of torch are you using for piping that large, oxy-acetylene?  Have you ever dabbled with the electric clamp on “torches” for copper?

  • Like 1

Share this post


Link to post
Share on other sites
 
JCM

Kevin, outdoors when windy I used an LP Turbo torch and indoors an Acetylene with a large # 5 tip, no oxy. Have never used clamp on. I have not done this type of work this big since before 1987 but as they say it's like riding a bicycle you never forget how. Each piece of copper was half round filed on the inside and a slight bevel on the outside then sanded , fluxed and soldered. That size copper does not want to fit together that easy or not at all without that prep work.   Thanks for your interest.

  • Like 1
  • Thanks 2

Share this post


Link to post
Share on other sites
 
Pullstart
14 minutes ago, JCM said:

Kevin, outdoors when windy I used an LP Turbo torch and indoors an Acetylene with a large # 5 tip, no oxy. Have never used clamp on. I have not done this type of work this big since before 1987 but as they say it's like riding a bicycle you never forget how. Each piece of copper was half round filed on the inside and a slight bevel on the outside then sanded , fluxed and soldered. That size copper does not want to fit together that easy or not at all without that prep work.   Thanks for your interest.

 

I’ve dabbled with big copper at my old house a bit, but just fixing traps and vents.  The entire drain system was copper, even the 3” runs!  

  • Like 1

Share this post


Link to post
Share on other sites
 
squonk

I see all those coils and all those trees and down in a hole with close walls. That equals clogged coils and high head pressures. Maintenance staff better stock up on Nu-Brite!

  • Like 1

Share this post


Link to post
Share on other sites
 
JCM

@squonk    I believe the next phase of that job is an entire roof along the outside of that building to cover all that work. Good Call.

Share this post


Link to post
Share on other sites
 
squonk

I hope the roof is not to close to the top. All that hot air has to escape. I've seen fences put around those. Fences catch paper and leaves and then they get sucked into the coils.

Share this post


Link to post
Share on other sites
 
tom2p


great job !

 

 

  • Thanks 1

Share this post


Link to post
Share on other sites
 

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now

×
×
  • Create New...