Jennifer 1,877 #101 Posted March 15, 2020 On 3/11/2020 at 9:59 AM, Mickwhitt said: Hi all, Demolition day, took out the sleeper wall and put the I beam in ready to be packed in place. Mrs whitts with her de mo lition hammer. She is good at knocking things down. Tired now, need to rest up a bit before I start the next phase. Mick Now we really have Proof who’s been doing all the hard work! Lol😂🤣 4 Share this post Link to post Share on other sites
Pullstart 62,783 #102 Posted March 15, 2020 1 hour ago, Mickwhitt said: It's not been too bad really . Bit sore on the shoulders shoveling the heavy clay, but not as decrepit as I thought lol. you can see from the damp mark's on the brickwork where we have taken out the clay. Not too far off with the levels now, I'm going to do two separate slabs to make it a stepped floor with a ramp. Even thinking about mixing my own concrete rather than ready mix to give me a bit more time but I will see what the price comparison is. Mick 14 minutes ago, Jennifer said: Looks like you are going to really have some space! What’s the dimensions of that room again? That’s quite a workshop if you have the room! I have done a few concrete jobs around the house at my old place, once I mixed 21 80 lb bags of concrete for a foundation by hand and we started at 9 at night thinking it wouldn’t take too long! Work was slow going in the morning indeed! If you choose to mix it yourself, at least rent a mixer! On the second foundation and replacing a floor in the porch, the couple 20’s it cost for the mixer was well worth it each time! Share this post Link to post Share on other sites
ebinmaine 67,266 #103 Posted March 15, 2020 1 hour ago, Jennifer said: Now we really have Proof who’s been doing all the hard work! Lol😂🤣 Not shocking. Everybody knows Trina does all the work round here. 2 Share this post Link to post Share on other sites
Stormin 9,981 #104 Posted March 15, 2020 3 hours ago, Mickwhitt said: Not too far off with the levels now, I'm going to do two separate slabs to make it a stepped floor with a ramp. Even thinking about mixing my own concrete rather than ready mix to give me a bit more time but I will see what the price comparison is. Mick May I ask why split level with a ramp? Hire a mixer and you self and your beautiful assistant will soon have it done. 2 Share this post Link to post Share on other sites
Mickwhitt 4,584 #105 Posted March 15, 2020 I was thinking of splitting the level to make things easier, it slopes down quite a bit and I've never concreted a slope. If I did the top section almost level I could slope the bottom section toward the door. Mick 1 Share this post Link to post Share on other sites
Stormin 9,981 #106 Posted March 15, 2020 (edited) Don't make the slope too steep. Don't forget you'll be pushing things in there. Edited March 15, 2020 by Stormin Share this post Link to post Share on other sites
Mickwhitt 4,584 #107 Posted March 16, 2020 I'm going to take a step back and have a good look at the space now the area is clear. If its necessary to shift some more soil I'd rather do that than wish I had in a few months time. There is no rush and it might be better to let things dry out a bit more after our record rainfall. Still plenty I can be doing, electrical sockets, lighting to sort, shelves and brackets etc. Plus I'm really busy with our toad crossing. Its migration time and I'm out every evening rescuing toads from the busy road outside our home. Mick 4 Share this post Link to post Share on other sites
ebinmaine 67,266 #108 Posted March 16, 2020 Just now, Mickwhitt said: take a step back and have a good look at the space now the area is clear. If its necessary to shift some more soil I'd rather do that than wish I had in a few months Best advice one can give on a project no matter what it is. Excellent that you can offer it to yourself. 1 Share this post Link to post Share on other sites
Stormin 9,981 #109 Posted March 16, 2020 I've made that mistake myself in the hurry to get things done. Share this post Link to post Share on other sites
Mickwhitt 4,584 #110 Posted March 16, 2020 Crikey, just looked back over my messages about this. I only really started on 15th Feb. So only a month to get this far. And that's only doing odd days here and there. I can definitely afford to take a breath and look at my options. Cost wise self mixing is the best option, also I can do things at my own pace instead of having a cement truck driver wanting to drop it and go. I will keep you all updated. Mick 2 1 Share this post Link to post Share on other sites
Mickwhitt 4,584 #111 Posted March 16, 2020 This is my sweeper driven into the new space. Plenty of room in there so I will be driving Fred in there as soon as possible to see how he fits. Ready mixed concrete around £200 but a lot cheaper to buy in the materials and do it myself. Now my arms have toughened up looks like I will be getting the mixer out. Mick 1 1 Share this post Link to post Share on other sites
Mickwhitt 4,584 #112 Posted March 19, 2020 Not much more I can do before I have to start with the concrete. Plenty of room for Fred 3 1 2 Share this post Link to post Share on other sites
Stormin 9,981 #113 Posted March 19, 2020 What ceiling height will you have, Mick? About 5ft? Share this post Link to post Share on other sites
Mickwhitt 4,584 #114 Posted March 19, 2020 A little over 5 foot yes, not as much as I'd like but it's ok for storage. I can ride in on Fred so it's high enough. Mick 3 1 Share this post Link to post Share on other sites
Stormin 9,981 #115 Posted March 19, 2020 Just don't stand up suddenly. 2 Share this post Link to post Share on other sites
ebinmaine 67,266 #116 Posted March 19, 2020 Oh man! I would SOO bash my head on a regular basis... 1 Share this post Link to post Share on other sites
rjg854 11,349 #117 Posted March 19, 2020 I probably wouldn't have much of a problem at all 6 Share this post Link to post Share on other sites
SylvanLakeWH 25,490 #118 Posted March 19, 2020 1 minute ago, ebinmaine said: Oh man! I would SOO bash my head on a regular basis... Just a thought... I would cover the bottom of that beam with a bunch of cheap dollar store foam “noodles” to soften the inevitable blows to the noggin... get them for a buck each around here... See photo of the ones I picked up on a trip out west to “fix” our roof rack that started rockin and rollin... 3 1 Share this post Link to post Share on other sites
Pullstart 62,783 #119 Posted March 20, 2020 3 hours ago, rjg854 said: I probably wouldn't have much of a problem at all You and me both! Sorry EB! 3 Share this post Link to post Share on other sites
Tractorhead 9,064 #120 Posted March 20, 2020 @Mickwhitt great Job you and your Wife did 👍 @ebinmaine i‘m in with headbashing, even i knew it.😎 @SylvanLakeWH great idea, did the same on my Motocycle Port. but it ain‘t lasted long, few stronger Winds and it passes. but on my Motocycleport i have a simple solution, i wear my helmet before pic the Bike. but maybe can be glued with Foam. Btw, is there a chance to dig maybe about 2 feet deeper before you built the floor? so you had a fair chance to have a small heated Workshop in, i.eg. For small Maintenance in Winter. 2 Share this post Link to post Share on other sites
Mickwhitt 4,584 #121 Posted March 22, 2020 Hi tractorhead, I'm not digging down much further as I might disturb the foundations. It's ok for me to work in actually as I sit on a wheeled stool for most jobs service wise. Mick 1 Share this post Link to post Share on other sites
Mickwhitt 4,584 #122 Posted April 4, 2020 Hi all. I've been keeping busy during the lockdown. Dug out the floor to the level I want ready to concrete. I'm building a small wall to split the room into two levels, this deals with the slope and makes less digging out. If I can get some materials delivered next week I may be able to crack on a bit. Be nice to finish the lower level near the door so I can use it to work from. 5 Share this post Link to post Share on other sites
Mickwhitt 4,584 #123 Posted April 5, 2020 ok so I now have my two levels set. Little wall to work from for the bottom deck of concrete. Then I will sort out what I want to do up top. 3 Share this post Link to post Share on other sites
Mickwhitt 4,584 #124 Posted April 5, 2020 here's Fred with his little tipper trailer. Room for tools etc or a generator in front of the tipper. 2 Share this post Link to post Share on other sites
Mickwhitt 4,584 #125 Posted April 5, 2020 This is Fred, his trailer and the two wheeler Little Ted all snug on the top level. I fitted a kitchen vent fan this morning too so that condensation wont be such a problem. Just built an air box over the air brick and fitted a six inch fan. 3 Share this post Link to post Share on other sites