Jump to content
Sign in to follow this  
HorseFixer

Started Working In The Horse Stable!

Recommended Posts

HorseFixer

Real nice Duke. They fit under there just right :whistle: . Are any of em leakers or drippers?

Mike........

Thanks Guys! :whistle:

Mike nope no leakers or drippers in this bunch, :dunno: however I have a 702 that is a dripper and plan on draining it before it goes on the platform this weekend. The 701 that I am restoring has a seal leak in the rear end and thats getting a Resto so everything will be underway on that project by end of this month. :thumbs:

Share this post


Link to post
Share on other sites
 
KyBlue

Bout time Duke! .... youve done such a nice job on the stable... lookin forward to seein a resto..

Share this post


Link to post
Share on other sites
 
HorseFixer

Thanks! :thumbs:

Well 5 more tractors hit the stable today and made it on the platform. The Platform just stood there and laughed at me! :dunno: I think it made some smart azz comment like "DUKE IS THAT ALL YA GOT? :lol: That's the problem with overbuilt Platforms they act too Cocky :whistle: Anyways here are some picks of the

Duke's Thundering Herd! :whistle:

HorseStable260.jpg

HorseStable262.jpg

HorseStable264.jpg

HorseStable266.jpg

HorseStable268.jpg

  • Like 3

Share this post


Link to post
Share on other sites
 
C-Series14

Looks awesome Duke! I guess you are lucky you don't collect the C-Series! :whistle: I have a hard enuf time getting attachments up on my storage shelf! Really a professional looking job... :thumbs:

Share this post


Link to post
Share on other sites
 
linen beige

Boy doesn't the Red look good next to that Green Grass carpet? :whistle: Hey wait a minute where have I heard that before :thumbs::dunno:

:whistle:

Now get on that 701! The june show aint that far off!

Share this post


Link to post
Share on other sites
 
HorseFixer

:dunno:

Now get on that 701! The june show aint that far off!

Don't crowd me Jim! :D Believe me I already know I'm under the gun, :whistle: Still got a little more to do in the Garage / Stable yet. I have to make / weld those shelf bracket supports, assemble and install my new sand blast cabinet and hafta clean up the 1054 & 953 and get all the implements in the stable yet. Plan on starting the 701 after next weekend, Hopefully I will have all of that done by then, If not the 701 project will be starting anyways. :whistle:

Share this post


Link to post
Share on other sites
 
HorseFixer

Have been fabricating the shelf brackets that will suspend the the shelf to the roof rafters by way of 1/2" threaded rod. Before that can be accomplished I had to fabricate the brackets that will attach to the ceiling and another that will attach to the shelf. The Ceiling brackets will be held by 7/16' X 3" long lag bolts. The ones on the shelf will go thru the face with 7/16" X 1 1/2 lags. they will have washers installed. I cut the ceiling brackets at the same angle as the ceiling then welded 1/2" black Iron pipe acting like sleeves to allow the 1/2" threaded rod to go through. The shelf can then be raised to be level and should support a tremendous amount of weight. By the shelf being suspended in this manner will allow tractors or other implements to be moved underneath. There Will be 5 of these installed about 4' apart. Should have them installed and painted by weekend.

Oh and by the way.... The lift table also makes a great portable adjustable height welding table! Was gonna paint it but now I think not! :thumbs:

HorseStable270.jpg

HorseStable274.jpg

HorseStable271.jpg

HorseStable272.jpg

HorseStable273.jpg

HorseStable276.jpg

Share this post


Link to post
Share on other sites
 
HorseFixer

Got the shelf brackets all hung and painted. When I cranked them up tight the whole world moved :thumbs: sure wasn't the stable! :whistle:

HorseStable280-1.jpg

HorseStable281-1.jpg

HorseStable282-1.jpg

Share this post


Link to post
Share on other sites
 
Butch

Looks good Duke. Now why don't you give your wife some attention. :thumbs:

Share this post


Link to post
Share on other sites
 
HorseFixer

Looks good Duke. Now why don't you give your wife some attention. :whistle:

Can't Bro Im still under the gun! :thumbs: PoW! While painting the Deck Rack Waiting To Dry, gotta start tear down of the 701 tonight, Then gotta start getting the impliments in the stable and 1054 cleaned up and in her place! Full steam ahead on the 701! Oh I forgot hafta put epoxy floor in the horse hauler get electric brakes hooked up on the motor home, get motor home seviced for the show! Whew MJ is gonna hafta wait! :whistle:

Share this post


Link to post
Share on other sites
 
HorseFixer

In between tearing down the 701 for a Resto painted the deck rack, should be hung on the stable wall this weekend. Will wash up some decks and get them slid onto the rack.

HorseStable283.jpg

HorseStable284.jpg

HorseStable285.jpg

Share this post


Link to post
Share on other sites
 
Iggy68

Duke I clicked on the pic in your signature and read this thread. Awesome job! Here is the problem, ever DVR a tv show and the previous program runs over time and you miss the last ten minutes of the show? Well where are the pics of the mower deck racks installed?

  • Like 2

Share this post


Link to post
Share on other sites
 

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

  • Similar Content

    • Travas
      By Travas
      Hello everone reading this. Im currently in the process of building a race mower out of a front engine 8-32 toro. It was sitting outside for the longest time because of a broken axle. It believe it has a vertiical 8 hp b&s that had running. Here is some some photos of it.  I put a bifferent transaxle in because it was spare one laying around. I put it on and it fits pretty well. Altho i had to remove all the clutch and shifter parts to get it in, but hey it works. I got a wheel on and tried getting the other off the axle it was on. So i put it in the press and tried for about a half hour before in popped loose. After that it took me about 15 mins and got it off. It was really  rusted on there! Put it on the transaxle to how it fits and looks. Now im in the process of drilling a hole the axle for the key in the wheels. Any suggestions or ideas? I will update this project when do some more work on it. 









    • mmmmmdonuts
      By mmmmmdonuts
      I have approximately an 10x12 lean to shed attached to my house on the side of my side loading garage. I currently have a double door that is 6' wide by 6x10" high. The problem I am having is the door starting to fall apart. It is also framed very heavily with 2x6s. So I am currently looking to either do another double door or a garage door. Part of the reason the door is getting damaged in the first place is because water pools at the bottom of the door in the winter and freezes and I have to basically heat and or chisel the ice away. It is where I store my snowblower. 
       
      My wife ruled out a sliding barn door and a roll up door mainly for appearance purposes.
       
      I was starting to lean to a 8w x7h regular garage door but see a few cons. 
       
      1) It would block the light when up. 
      2) I would lose quite of bit overhead storage and about 2 feet of wall space.
      3) There would be much more work reframing parts of the wall to fit the door.
       
      Pros.
      1) I could fit my wheel horse plow and snowblower side by side. 
      2) Shouldn't freeze to the concrete as easily with a rubber seal. 
      3) Don't have to shovel out the doors to get the snowblower out. 
       
      I was wondering what thoughts you guys had on and if I am missing something.
       
      Thanks. 
       
    • CasualObserver
      By CasualObserver
      I've been dreaming of a new shop space to work on tractors and generally store things at my house. We already had a three car garage on the house and could only fit one vehicle in it due to the large space that kids toys, bikes, zero turn mower, shelving and a workbench already occupied. Well.. that stuff and a few or so little garden tractors... but they don't take up that much space, right?   Anyway...  we'd been talking about building my dream shop for several years. We live on a large in-town parcel, so there's plenty of room, but as with most things, it comes down to when it can fit in the budget. I drew it up several times on the building designer at Menards dreaming of when we could go forward. Well, in the early 2017 we decided to go ahead with it, and I came up with my final layout plan.

      We proceeded under the option of build the shell, and finish what we can later. We went over and over the list of things to do now and later. Things I wanted that had to be done now for sure were the rough in for the in-floor heat and the attic trusses. I had a contractor friend who would GC and frame it for me if I bought all the materials and he could do it on his own schedule. Yep, done. I figure I could have built it myself, but it would have taken most of the summer of every night and weekend, as well as the headaches of arranging the subs for the stuff I couldn't do, but if he could do it, and he has all the contacts/subs already... I'm money and time ahead to work some extra overtime and avoid the headaches.
       
      The previous owners of our place had a gravel RV parking next to the house. The old poorly done timber walls were deteriorating and leaning with age.It was convenient for parking the trailer, and nice when the kids were little that we could park off the driveway so they could play, but every year inevitably it was always a weedy mess by mid-summer.


       
       
      Step one, remove ugly timber wall.  Lucky for me my neighbor had an chainsaw with a garbage blade on it. He came over and we were able to cut the wall into 12 ft sections that we loaded on the trailer for the dump.


       
       
      Next, met with our contractor friend to stake and mark it out. Since part of the goal was to reduce the amount of gravel, the equivalence of one car parking space was being removed and returned to grass on the left edge.


       
       
      Then just before the excavator was to start work, the kids and I did a little groundbreaking for the big project.

       

      Some gravel removed and sand base laid down and compacted.



       
       
      Concrete guys laid the forms for me on a Friday night so I could lay the insulation and pex for the in-floor heat.


       
       
       Like any kids, the call of the sand pile was irresistible.


       
       
      Next day I had help to lay the insulation boards and pex. Might seem silly to see two people carrying these boards that weigh all of 2 lbs each... but notice all the pavers? I'd been hoping for good weather to do the insulation and pex..... what I got was great temperature, bright, sunny......and 25 mph sustained winds with 40-50 mph gusts. So.... two guys to carry each flippin' board and weight it down. Ugh.... made the process much longer.


       
       
      Got the pex down, which went very smoothly. Three zones, stapled to the foam board.


       
       
      Monday morning I get a call.... inspector won't pass it because there's no pressure test on the pex. Ugh. Nothing about that in our building code, but what am I going to do? Project can't go on without his initials. So... I build a pressure manifold, tie all three zones into one long line and charge it up.  Tues morning, concrete guys are onsite... inspector shows up and says ok.

       
       
      By the time I get home from work, I have a new slab.  


       
       
      Lumber pack shows up the day before the family and I are leaving for a week at the cabin. When I pulled out of driveway, construction was underway. We got a few progress pics through the weeks from various friends.


       
       
      And I returned a week later to this.  Totally the best way to build a shop!  I was out of his way, he was out of mine... worked out perfectly.


       
       
      I installed the overhead doors, had the electrician come and trench the electric over. Got the gas line roughed in for the boiler as well while the trench was open.





       
       
      After that, the excavator came back with the final top dress for final grading.  



       
       
      We bit the bullet and decided to go with sod right away. Even got the kids to help for a little while. Couple of neighbors (one of whom happens to be a professional landscaper) came over the chip in too, and three pallets later....



       
       
      Now we're at slow progress time. I bought all the construction materials on a Menards 11% rebate, so once I got the rebate check I started to finish the interior. Got the vapor barrier up, and ceiling rocked with 12 foot 5/8" type x. 105 lbs each. Ugh. Thank God for drywall lifts, right!?


       
       
      More rebate checks allowed for the insulation and rock for the walls.



       
       
      Then we came to a complete standstill..... got enough stuff moved out of the house garage to get both the car and truck in for the winter, but with no heat and no ceiling insulation the shop was just a big storage box for winter.

       
       
      Spring this year rolled around and prioritizing shop work made it to the list. I realized it's going to be much easier to get the interior done before I move in. So... started back at it. I got the floors masked off and got tape and mud done... then the girls helped me paint.





       
       
      Did the floor with Rock Solid polycuramine kits from Menards... grey with flakes and a textured topcoat to make it less slippery if wet. This is a long and multi-stage process. First it required renting a diamond grinder and grinding off the curing sealer. Then powerwashing three times to remove all dust and debris.  The base coat went on, cured for a few days, and topcoated three days later. Then I let that cure for a week before moving in. It's supposed to be cured in 24 hours, but why rush it if not necessary?




       
       
      Finally ready to move in.


       
       
      Got some used kitchen cabinet take outs and installed them for the workshop area.




       
       
      Really looking forward to getting stuff organized and cleaned up now.  It's totally a dream come true. Still have to buy and install the boiler and get the ceiling insulated... but those are things that can be worked around. Up until this point it's been much easier to have minimal stuff in the way.
       
      If you made it all the way to the bottom, thanks for taking the time to read it.  Get more done, have more fun!!   
       
       
       
    • Pullstart
      By Pullstart
      Pretty soon, the tractors will have a place for everything and everything in it’s place!
       
      We put up another section of racking and it will allow for some custom pallets at 66” long and 44” wide to store tractors 3-wide in the racking.  The closest green upright is 9’ tall, it’ll be a shell for the buggy to rest on top of 


×
×
  • Create New...