HorseFixer

Started Working In The Horse Stable!

Recommended Posts

linen beige

I'm curious about the ground connection in the first pic. The NEC doesn't allow more than one wire connected to a lug on an outlet, or any device. Those two outlets would need to each have a pig tail running to the bare ground wire. Your way is electrically the same and saves a wire nut and room in the box, but our local inspector will gig ya on that one every time. :D A couple of them won't allow the lugs if they aren't soldered, yet one will allow two wires crimped into one long lug. He says the long lug satisfies his definition of a pig tail? :hide:

All those outlets makes me wonder just how many battery chargers you're planning to run in there Duke? Any ventilation for all the gases they'll stir up?

Share this post


Link to post
Share on other sites
 
noncritical

looks really good fine job i will stay away from the pink comments lol

Share this post


Link to post
Share on other sites
 
HorseFixer

I'm curious about the ground connection in the first pic. The NEC doesn't allow more than one wire connected to a lug on an outlet, or any device. Those two outlets would need to each have a pig tail running to the bare ground wire. Your way is electrically the same and saves a wire nut and room in the box, but our local inspector will gig ya on that one every time. :party: A couple of them won't allow the lugs if they aren't soldered, yet one will allow two wires crimped into one long lug. He says the long lug satisfies his definition of a pig tail? :hide:

All those outlets makes me wonder just how many battery chargers you're planning to run in there Duke? Any ventilation for all the gases they'll stir up?

Your right Jim! :omg: But those "as I call them" HECTOR THE ELECTRICAL INSPECTORS are the same guys that okay a push in wire on a cheesy connector on the back of an outlet! :D and thats okay right? :D Ive seen outlets sizzle and melt from those cheap azz spring connectors with no surface area to grab the wire! When I crank down on a screw you can rest assured its tight I tug all the connectors real good before buttoning it up :hide:

Some Codes are just plain bullshit, and thats one of them. there is more resistance in a solder joint than two wires twisted together. I have proven this with an ohm meter. You wouldn't think so but lead is not as good a conductor as going straight copper to copper. There is very low amperage gassing on a battery maintainer prolly about a quarter amp there is no worries there, so don't loose any sleep over Dukes Setup! I won't burn my stable down! :omg:

Share this post


Link to post
Share on other sites
 
Suburban 550

The Stable looks SUPER ! :D And yes Duke, I do trust your electrical work. :hide:

Share this post


Link to post
Share on other sites
 
linen beige

I hear ya on those push in "connectors" Duke. They ARE NOT allowed to be used here. I'm not loosing sleep, I was just curious.

BTW, those banners look good. Can't wait to see what ya do with the lighted sign! Ya gonna frame it in pink? :hide:

Share this post


Link to post
Share on other sites
 
HorseFixer

I hear ya on those push in "connectors" Duke. They ARE NOT allowed to be used here. I'm not loosing sleep, I was just curious.

BTW, those banners look good. Can't wait to see what ya do with the lighted sign! Ya gonna frame it in pink? :hide:

Jim, I haven't quite decided yet how I am going to do the case for the lighted Wheel Horse sign yet. One thing for sure it won't be framed in PINK :D The Case needs to be able to opened to replace the fluorescent tubes and the sign is about 5' 8" long and about 30" wide. And of course I think Red would be the best color for the frame. The light will be turned on by a switch in the 3 gang box to the right of the exterior door.

Have hung a few more signs up. And finished all the wall receptacles tonight. the plan is to hit it hard and heavy this weekend on the shelving and the platform. That in itself will be a big task. I have some welding to do on special made brackets that need to be built because the self will be suspended by threaded rod they will need to be adjusted to level and suspend the outward portion of the shelf. I chose threaded rod because I think it will be less obtrusive and beneath will be Tractors so I can't have floor supports.

Share this post


Link to post
Share on other sites
 
big mike

Duke,you sure he meant hydrogen from charging batterys or methane from the crock pot of chili? :hide:

Share this post


Link to post
Share on other sites
 
HorseFixer

Duke,you sure he meant hydrogen from charging batterys or methane from the crock pot of chili? :hide:

Mike yer a funny man! :omg: Funny guys are from NILES! :hide: Hey Wait! I resemble that statement! :D

Share this post


Link to post
Share on other sites
 
HorseFixer

Well I have hung up some more signs and finished all of my receptacle wiring. I also stopped by my Sheet metal Guru doode and had him make me some galvanized wrap to go around the door frame leading from the garage to the stable. I didn't want to use wood casing because this would further take away the width of the doorway and I need all the space I can get. Sooo I had it made out of 26 ga galvanized. This will be prepped and painted WH Red like the rest of the trim. This weekend will be building shelving and the platform.

More Signs

HorseStable097.jpg

HorseStable099.jpg

HorseStable098.jpg

Galv Door frame Wrap

HorseStable096.jpg

HorseStable100.jpg

HorseStable101.jpg

HorseStable103.jpg

Share this post


Link to post
Share on other sites
 
Butch

:hide: :D :hide:

Share this post


Link to post
Share on other sites
 
HorseFixer

Thanks Butch

Well started working on my platform tonight the first order of buisness was to build my JIM BEAM! :hide:

HorseStable104.jpg

HorseStable105.jpg

HorseStable106.jpg

Share this post


Link to post
Share on other sites
 
HorseFixer

Now comes the Important part the building of the platform to double stack the "Round Hoods" to optimize every bit of space I can. This platform will support 6 tractors I figure for the sake of argument each tractor will weigh 400 lbs X 6 = 2400 lbs. All of this was taken into consideration when selecting materials. I used 2X6's for the beam with 1/2 OSB material in between each 2X6. Along the wall was also mounted a 2X6 screwed & 4" Lag bolts were used in each wall stud. The beam will have a total of 4 supports 3 being 4X4's treated. I also installed additional supports in each wall stud to support the 2X6 against the garage wall. The platform will be sheeted with 3/4" OSB. The platform will be coated with Epoxy with the flakes the same color as the floor.

The platform was engineered by a contractor friend of mine to support 43 lbs per sq ft. The tractors at the given weight of 400 ea is 29.09 lbs per sq ft. The platform is 5.5' wide X 15' long = 82.5 sq ft. 2400 / 82.5 = 29.09 this makes the platform over 30% stronger than it needs to be which is a good thing to support this precious cargo! :hide:

HorseStable107.jpg

HorseStable109.jpg

HorseStable110.jpg

HorseStable111.jpg

HorseStable118.jpg

HorseStable119.jpg

HorseStable115.jpg

Share this post


Link to post
Share on other sites
 
HorseFixer

The company that I have decided to get my floor Epoxy from Epoxy Coat Website mailed me the base coat sample and a bunch of flake samples that they thought would look good after I showed them some pictures of my stable. So I have had some help from a bunch of people at work and this is the sample that we thought would look good on the floor. The Beige is a darker beige than is on the walls the long stirring stick shown is the Linen Beige the lighter chip color that pretty close matches that is called Milk Weed. The Wheel Horse Red on the trim they call Lipstick Red And the gray looking color flake is called Graphite. I think this will really pull it all together with the floor and the top of the platform with this color scheme. What do you guys think? :hide:

000_0079.jpg

Share this post


Link to post
Share on other sites
 
Guest fireman

Duke,

I have been following this thread getting some ideas to finish off my workshop. All I can say is "WOW", you did a top notch job!My only issue is I had to move all my things in before it could be completed. I still have to put in a drop ceiling and paint. I also want to epoxy the floor. I guess I will have to rent one of those PODs to store my stuff in this spring so I can get everything out and finish.

P.S. Where did you get the lumber from? That stuff looks straight and true with not a lot of knots or blems. Very clean wood :hide:

Jeff

Share this post


Link to post
Share on other sites
 
BairleaFarm

This whole thing is absolutely awesome. I cant wait to see it finished.

Share this post


Link to post
Share on other sites
 
64s

Duke, The easiest way to light your sign is to actually keep the sign and lighting separate. Attach your light to the wall and then hang the sign over it. You can keep it simple by putting a simple frame around it (routering the backside of the frame to accept the sign's lip), or you could add some dimension and build a beefier frame. Since you have a switched box you don't have to deal with separate switch.

Thanks for sharing your project with us!!!!!!!!

Share this post


Link to post
Share on other sites
 
HorseFixer

Thanks Fireman, Simpleman & 64's :thumbs: I don't know what drives me I guess you guys OK OK I wanna get this damn thing done So's I can start working on a tractor in a clean shop finally! :D

The bottom line is when yer dealing with lumber yards or anyone for that matter dont let them tell you how its gonna be you tell them! That has always been my approach! If they want my money there gonna hafta give me service plain and simple! :whistle:

Jeff the lumber was purchased at Lowe's but like anything at any lumber yard ya gotta sort! If they don't have what I want I get into their chit Real Good!!!!! And I mean Real Good...... and tell um to bust another bundle of lumber open!!! :omg:

they don't like it put I tell um thats tuff chit!! Thats the way I always have been when I put on my 1400 sq ft addition back in 1999 it was the same drill I ordered all my stuff thru 84 lumber, I told them to bring me 400 2X4's I sorted and sent 200 back.

I told the sales guy if he didn't like it I would drive over there and pound a knot in his head! :lol:Im not trying to act like a hard azz or something, but hey those hard earned dollars come hard and I want the best bang for my buck! Anyways I told him I needed another 200 straight 2X4's and he better hand pick um himself!! He did and I got what I needed! One time they made a delivery when I wasn't home and dumped and skinned up my tung and groove OSB I told them That was unacceptable!!! And to bring me out another duplicated load and to

unload it by hand and stack it nicely and cover it up! Not out in the rain like the last load! <_< Ya just have to be demanding! When I was in the HVAC business I bent over back wards for my customers, I gave them a value and did what they asked, plain and simple without my customers I would have starved!! More of these stores need to realize that!

Yep I know what ya mean luckily I have another 1200 sq ft to store my stuff or I would be up a chit creek, What you see here has taken over a year of thought and planning it didn't happen over night. I have been thinking about this for along time and still I'm sure when completed wish I would have done things differently :dunno: Isn't that always the way it is? :whistle:

Share this post


Link to post
Share on other sites
 
HorseFixer

Well the main part of the strength of the platform is the 4X4 upright supports. They need to be anchored real good at the base and I didn't want to use angel Iron with some Taco Bender Fastener So I decided to go a blind fastener. If you have ever worked in construction they make epoxies that are harder & tuffer than my X Ole lady! :dunno: You wont find these at the BIG BOX STORE you would order these from FASTENAL it takes a special gun for application and they even make a pneumatic gun for large jobs. Here is how I did it!

I cut (3) 5" long by 5/8 threaded rod drilled a hole in each 4 X 4 base and drove the threaded rod 3" into the 4 X 4. This left 2" to go down in the concrete.

HorseStable123.jpg

The next thing I did was use a 5' Level and located where the 4X4's would be on the concrete and make sure they were plumb. And made an X for the center Where the 1" hole would be drilled.

HorseStable124.jpg

HorseStable125.jpg

I drilled holes 3" deep to accept the 2" threaded rod stud. Its good to have a vacuum Sweeper hooked up picking up the dust as you go and an air compressor to blow all the remaining dust out of the hole.

HorseStable126.jpg

HorseStable128.jpg

This product is Unitex Brand sold by fastenal, Once this stuff is set in concrete properly it will not move!! PERIOD fill the hole up as shown. If you look closely at the application tip of this product it has an internal swirling mixing tip that mixes the two parts when you squeeze the gun. The tips are 3 bucks a piece so you want to keep the product flowing and have everything ready so you can keep moving once you start! :thumbs:

HorseStable129.jpg

HorseStable130.jpg

HorseStable131.jpg

After you have the epoxy worked in the hole filler up to the top and around the edges of the hole once you set the 4X4 post any that oozes out will fill any crevices and if your floor is off a bit out of level the excess will fill the gaps! :whistle:

HorseStable132.jpg

After the post is set anchor the top in place where ya want it. It is okay to put some on top of the post!

HorseStable134.jpg

Let posts set for 24 hrs and you have a rock solid support! :whistle:

HorseStable133.jpg

Share this post


Link to post
Share on other sites
 
WHC-125

That is coming out ahhhhhhhmazzing :whistle::whistle:

You have to put in a microwave and a fridge and your all set :thumbs:

Share this post


Link to post
Share on other sites
 
HorseFixer

That is coming out ahhhhhhhmazzing :whistle::dunno:

You have to put in a microwave and a fridge and your all set :thumbs:

Thanks Chris I just picked up a good size college type dorm fridge a couple weeks ago and keep it at 29 deg :whistle: The pop when it comes out has a slightest amount of slush in it. The beer is perfect so cold it will bust yer teeth! :omg: So I hafta drink um quick! :omg: Whats the microwave for :lol: Did I tell ya I love to cook on the grill! :D

Share this post


Link to post
Share on other sites
 
linen beige

Why didn't you just set some J bolts when you poured the floor? :thumbs:

JK, Looks good.

Share this post


Link to post
Share on other sites
 
HorseFixer

Started putting up the shelving today got a couple sections up, this shelving will run the entire length of the stable. It will be suspended from 1/2 threaded rod from the ceiling joists. This will require custom made brackets at the ceiling and at the shelf, which I plan to fabricate this week. The shelf is plenty Strong to support its own weight but for the equipment I will be putting on it, it will require much more strength! :thumbs:

HorseStable139.jpg

HorseStable135.jpg

HorseStable136.jpg

Share this post


Link to post
Share on other sites
 
Butch

What a disappointment. Ya didn't countersink your lag bolts and plug the holes with dowels matching the wood grain. And look at those legs. They're square. I can't believe you didn't turn them on a lathe. Now you're gonna "sprinkle" some flakes on an epoxy floor. I pictured you to have the WH Head painted in the center of the floor and then use an epoxy clear coat finish over that. You sure are starting to slack off on your projects! What happened to your craftsmanship? :thumbs:

Share this post


Link to post
Share on other sites
 
Duff

Duke, the place is looking GREAT! :thumbs:

One quick question - a concern from a friend, not a criticism. Are those 4x4's pressure treated (just looking at the color)? If so, are the fasteners you are using to tie into them either ceramic coated or stainless? The new PT has a chemical in it that supposedly eats steel like salt on a scratch on a car body panel :dunno: . I used old-style galvanized deck screws a couple years ago to replace part of my deck and when I broke one of the boards this past summer (another whole story :whistle: ) I played H*ll getting the old screws out - the shanks were completely rotted already. Apparently galvanized is no longer good enough.

Pro carpenters out there....any thoughts?

Duff :whistle:

Share this post


Link to post
Share on other sites
 
HorseFixer

Duke, the place is looking GREAT! :thumbs:

One quick question - a concern from a friend, not a criticism. Are those 4x4's pressure treated (just looking at the color)? If so, are the fasteners you are using to tie into them either ceramic coated or stainless? The new PT has a chemical in it that supposedly eats steel like salt on a scratch on a car body panel :D . I used old-style galvanized deck screws a couple years ago to replace part of my deck and when I broke one of the boards this past summer (another whole story :lol: ) I played H*ll getting the old screws out - the shanks were completely rotted already. Apparently galvanized is no longer good enough.

Pro carpenters out there....any thoughts?

Duff :whistle:

Thanks Gentleman! you too butch! :omg:

Duff I had a simular situation a couple years ago myself and checked into what you said and found that they are now making coated deck screws for treated lumber that are like gauranteed for 50 years. If you look on top of that beam you will see coated screws there are only a handfull of nails used anywhere on the horse barn everything is screwed and predrilled before screwed thats why you see somany drills around in the jobsite.

I have been told the reason there is a chemical reaction is because of constant moisture of the decks treated lumber being outside in the weather. I have also heard that the chemical in the treated lumber doesn't like the zinc in the galvanized coating :dunno: I donot belive in the dry there will be a problem. :whistle:

Share this post


Link to post
Share on other sites
 

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

  • Similar Content

    • Travas
      By Travas
      Hello everone reading this. Im currently in the process of building a race mower out of a front engine 8-32 toro. It was sitting outside for the longest time because of a broken axle. It believe it has a vertiical 8 hp b&s that had running. Here is some some photos of it.  I put a bifferent transaxle in because it was spare one laying around. I put it on and it fits pretty well. Altho i had to remove all the clutch and shifter parts to get it in, but hey it works. I got a wheel on and tried getting the other off the axle it was on. So i put it in the press and tried for about a half hour before in popped loose. After that it took me about 15 mins and got it off. It was really  rusted on there! Put it on the transaxle to how it fits and looks. Now im in the process of drilling a hole the axle for the key in the wheels. Any suggestions or ideas? I will update this project when do some more work on it. 









    • mmmmmdonuts
      By mmmmmdonuts
      I have approximately an 10x12 lean to shed attached to my house on the side of my side loading garage. I currently have a double door that is 6' wide by 6x10" high. The problem I am having is the door starting to fall apart. It is also framed very heavily with 2x6s. So I am currently looking to either do another double door or a garage door. Part of the reason the door is getting damaged in the first place is because water pools at the bottom of the door in the winter and freezes and I have to basically heat and or chisel the ice away. It is where I store my snowblower. 
       
      My wife ruled out a sliding barn door and a roll up door mainly for appearance purposes.
       
      I was starting to lean to a 8w x7h regular garage door but see a few cons. 
       
      1) It would block the light when up. 
      2) I would lose quite of bit overhead storage and about 2 feet of wall space.
      3) There would be much more work reframing parts of the wall to fit the door.
       
      Pros.
      1) I could fit my wheel horse plow and snowblower side by side. 
      2) Shouldn't freeze to the concrete as easily with a rubber seal. 
      3) Don't have to shovel out the doors to get the snowblower out. 
       
      I was wondering what thoughts you guys had on and if I am missing something.
       
      Thanks. 
       
    • CasualObserver
      By CasualObserver
      I've been dreaming of a new shop space to work on tractors and generally store things at my house. We already had a three car garage on the house and could only fit one vehicle in it due to the large space that kids toys, bikes, zero turn mower, shelving and a workbench already occupied. Well.. that stuff and a few or so little garden tractors... but they don't take up that much space, right?   Anyway...  we'd been talking about building my dream shop for several years. We live on a large in-town parcel, so there's plenty of room, but as with most things, it comes down to when it can fit in the budget. I drew it up several times on the building designer at Menards dreaming of when we could go forward. Well, in the early 2017 we decided to go ahead with it, and I came up with my final layout plan.

      We proceeded under the option of build the shell, and finish what we can later. We went over and over the list of things to do now and later. Things I wanted that had to be done now for sure were the rough in for the in-floor heat and the attic trusses. I had a contractor friend who would GC and frame it for me if I bought all the materials and he could do it on his own schedule. Yep, done. I figure I could have built it myself, but it would have taken most of the summer of every night and weekend, as well as the headaches of arranging the subs for the stuff I couldn't do, but if he could do it, and he has all the contacts/subs already... I'm money and time ahead to work some extra overtime and avoid the headaches.
       
      The previous owners of our place had a gravel RV parking next to the house. The old poorly done timber walls were deteriorating and leaning with age.It was convenient for parking the trailer, and nice when the kids were little that we could park off the driveway so they could play, but every year inevitably it was always a weedy mess by mid-summer.


       
       
      Step one, remove ugly timber wall.  Lucky for me my neighbor had an chainsaw with a garbage blade on it. He came over and we were able to cut the wall into 12 ft sections that we loaded on the trailer for the dump.


       
       
      Next, met with our contractor friend to stake and mark it out. Since part of the goal was to reduce the amount of gravel, the equivalence of one car parking space was being removed and returned to grass on the left edge.


       
       
      Then just before the excavator was to start work, the kids and I did a little groundbreaking for the big project.

       

      Some gravel removed and sand base laid down and compacted.



       
       
      Concrete guys laid the forms for me on a Friday night so I could lay the insulation and pex for the in-floor heat.


       
       
       Like any kids, the call of the sand pile was irresistible.


       
       
      Next day I had help to lay the insulation boards and pex. Might seem silly to see two people carrying these boards that weigh all of 2 lbs each... but notice all the pavers? I'd been hoping for good weather to do the insulation and pex..... what I got was great temperature, bright, sunny......and 25 mph sustained winds with 40-50 mph gusts. So.... two guys to carry each flippin' board and weight it down. Ugh.... made the process much longer.


       
       
      Got the pex down, which went very smoothly. Three zones, stapled to the foam board.


       
       
      Monday morning I get a call.... inspector won't pass it because there's no pressure test on the pex. Ugh. Nothing about that in our building code, but what am I going to do? Project can't go on without his initials. So... I build a pressure manifold, tie all three zones into one long line and charge it up.  Tues morning, concrete guys are onsite... inspector shows up and says ok.

       
       
      By the time I get home from work, I have a new slab.  


       
       
      Lumber pack shows up the day before the family and I are leaving for a week at the cabin. When I pulled out of driveway, construction was underway. We got a few progress pics through the weeks from various friends.


       
       
      And I returned a week later to this.  Totally the best way to build a shop!  I was out of his way, he was out of mine... worked out perfectly.


       
       
      I installed the overhead doors, had the electrician come and trench the electric over. Got the gas line roughed in for the boiler as well while the trench was open.





       
       
      After that, the excavator came back with the final top dress for final grading.  



       
       
      We bit the bullet and decided to go with sod right away. Even got the kids to help for a little while. Couple of neighbors (one of whom happens to be a professional landscaper) came over the chip in too, and three pallets later....



       
       
      Now we're at slow progress time. I bought all the construction materials on a Menards 11% rebate, so once I got the rebate check I started to finish the interior. Got the vapor barrier up, and ceiling rocked with 12 foot 5/8" type x. 105 lbs each. Ugh. Thank God for drywall lifts, right!?


       
       
      More rebate checks allowed for the insulation and rock for the walls.



       
       
      Then we came to a complete standstill..... got enough stuff moved out of the house garage to get both the car and truck in for the winter, but with no heat and no ceiling insulation the shop was just a big storage box for winter.

       
       
      Spring this year rolled around and prioritizing shop work made it to the list. I realized it's going to be much easier to get the interior done before I move in. So... started back at it. I got the floors masked off and got tape and mud done... then the girls helped me paint.





       
       
      Did the floor with Rock Solid polycuramine kits from Menards... grey with flakes and a textured topcoat to make it less slippery if wet. This is a long and multi-stage process. First it required renting a diamond grinder and grinding off the curing sealer. Then powerwashing three times to remove all dust and debris.  The base coat went on, cured for a few days, and topcoated three days later. Then I let that cure for a week before moving in. It's supposed to be cured in 24 hours, but why rush it if not necessary?




       
       
      Finally ready to move in.


       
       
      Got some used kitchen cabinet take outs and installed them for the workshop area.




       
       
      Really looking forward to getting stuff organized and cleaned up now.  It's totally a dream come true. Still have to buy and install the boiler and get the ceiling insulated... but those are things that can be worked around. Up until this point it's been much easier to have minimal stuff in the way.
       
      If you made it all the way to the bottom, thanks for taking the time to read it.  Get more done, have more fun!!   
       
       
       
    • Pullstart
      By Pullstart
      Pretty soon, the tractors will have a place for everything and everything in it’s place!
       
      We put up another section of racking and it will allow for some custom pallets at 66” long and 44” wide to store tractors 3-wide in the racking.  The closest green upright is 9’ tall, it’ll be a shell for the buggy to rest on top of 


×
×