Well it has been forever that I have wanted to build a nice barn to store my horses and work on them. Yesterday was the day that I started this long project. I will use this thread to document the progression. I anticipate this will be a several month build. Here is the start !

post-734-0-26297000-1406632995_thumb.jpg

post-734-0-53562300-1406633012_thumb.jpg

post-734-0-69523700-1406633021_thumb.jpg

  • Like 8

Share this post


Link to post
Share on other sites
 
Fun Engineer

You'll love the extra space. I know I do. u8a8eny5.jpg

  • Like 8

Share this post


Link to post
Share on other sites
 
Ken B

Way to go Steve! Its been a long time coming. Man, if tractor's could only talk and if they could I bet for the past few yrs. the Wheel Horse's have been asking Mr. Terra- Mite, "So, what are you doing here Mr. Terra-Mite and what exactly is your business here?" Says, Mr. Terra-Mite, " In time, you'll see"

Share this post


Link to post
Share on other sites
 
squonk

What?? No hard hat and gold shovels for the ground breaking? As Buford T. Justice would say , "What is this world coming to?"

  • Like 1

Share this post


Link to post
Share on other sites
 
SALTYWRIGHT

YOU DIG THE HOLE AND WE WILL COME AND FILL IT IN WITH GRAVEL.

  • Like 1

Share this post


Link to post
Share on other sites
 
meadowfield

Looking forward to this :)

Share this post


Link to post
Share on other sites
 
fireman

Man if I didn't have to work straight days this week I could be up there "playing" too!!!

Share this post


Link to post
Share on other sites
 
stevebo

I had my sidekick with me today after work. He likes to take his shoes off and play in the dirt....  I submitted all paperwork for the building permit and got a verbal ok to start.... :banana-tux: (that only cost $925) :omg:

 

 

The foundation contractor is stopping by this week to check out my work and give me pointers of what I need to do for him to be able to build his forms. 

 

 

 

post-734-0-17287600-1406682229_thumb.jpg

post-734-0-26287200-1406682240_thumb.jpg

post-734-0-47242500-1406682249_thumb.jpg

post-734-0-28415500-1406682394_thumb.jpg

  • Like 1

Share this post


Link to post
Share on other sites
 
Geno

Looks like you got some good help there on the mound.  B)

 

Congrats on the new Horse Barn!  :woohoo:

Share this post


Link to post
Share on other sites
 
Martin

what size barn are you building there, Steve?

Share this post


Link to post
Share on other sites
 
stevebo

The barn is going to be 24' x 36' with another 14' x 36' "pad" poured off the back side that may get enclosed at some point after the co :hide: . The floor layout will be 24' x 24' on bottom and then a wall separating the main area from the heated shop/work area that will be 12' x 24' (less the staircase leading upstairs). The second floor will be above the shop area and be 16' x 24' with a railing looking down over the lower main area. 

 

 Here is the link to the builder of the barn I am getting. 

 

http://www.harvestmoontimberframe.com/

  • Like 1

Share this post


Link to post
Share on other sites
 
Martin

sounds great. sometimes i wish i could have gone higher than 10' on the walls and build in a second level, but in town i was limited to 16' total height and 1000sq ft area.....

Share this post


Link to post
Share on other sites
 
stevebo

I am limited to under 1000 sf and a max height of 20 feet. This one is going to be 19' 6" based on the average of all four corners. They take the average of all 4 corners so I may have to add some dirt to raise the grade... 

Share this post


Link to post
Share on other sites
 
AMC RULES

:scared-eek:  Where's your lazer?  :scared-shocked:

Share this post


Link to post
Share on other sites
 
stevebo

Craig... I will leave that up to the concrete guy who I am paying ...

Share this post


Link to post
Share on other sites
 
specialwheelhorse

Insulate and wire that to the nines and you can work in there year round in a t shirt

And your baby's will love you for it.you will never regret it.

Gets up around a hundred hear in the summer and never gets above mid 70s

In the shop with a 10000 window unit and about the same in winter with a couple

Ceramic heaters.

Edited by specialwheelhorse
  • Like 1

Share this post


Link to post
Share on other sites
 
Geno

Insulate and wire that to the nines and you can work in there year round in a t shirt

And your baby's will love you for it.you will never regret it.

Gets up around a hundred hear in the summer and never gets above mid 70s

In the shop with a 10000 window unit and about the same in winter with a couple

Ceramic heaters.

 

Like special says, best money you'll ever spend.  Insulate it to death.  I made the mistake of not insulating good enough in the beginning when I built mine in 1997.  I put in 2 rooftop units for heating and cooling and you should have seen the electric bills!  A few years later we took all the metal off of the walls and blew 9" of foam in the walls + ceilings then put it all back together (what a pain).  I can heat the place with a match now and keep it as cool as I want for almost nothing and I have 5000 sq ft with 12 foot ceilings.  :)

Edited by Geno
  • Like 1

Share this post


Link to post
Share on other sites
 
stevebo

I do not plan on insulating this barn as it will lose the look I want. I plan on overheating the work area using wood. I do plan on installing the plumbing in the slab for radiant heat so I have that option at a later time. Here are some more pics of what I was able to get done after work today. Used the tiller to cut down the high end and the grader to level it out after. Had some mechanical issues with the terramite. I think it needs a carb cleaning. The C195 may have a clogged screen in the tank so i will take that apart and check it out but I want ot make sure that I have a new gromet before I do.

post-734-0-72941600-1406762095.jpg

post-734-0-86639900-1406762103.jpg

post-734-0-65070800-1406762113.jpg

  • Like 2

Share this post


Link to post
Share on other sites
 
truckin88

You are not building it yourself right? I mean how would you haul material with that chevy?

Share this post


Link to post
Share on other sites
 
stevebo

Will I could haul the material with a Dodge and  Ford attached to the back of the trailer too. I did a little tuner upgrade on it... Running over 800 ft lbs of torque now.... :banana-tux:

  • Like 4

Share this post


Link to post
Share on other sites
 
JC 1965

Wow !!  looks like a fine building Steve. You should have plenty of room and a good warm place to work on your  :wh: tractors or anything else for that matter. Thanks for sharing and please keep us updated on the progress.    :thumbs2:

Share this post


Link to post
Share on other sites
 
SALTYWRIGHT

steve do you need my gt-14 with the 3 point ?      RUSS

Share this post


Link to post
Share on other sites
 
Wheelhorsestory

Hi Steve,

What an ambitious and exciting project! Post and beam barns are very beautiful. I hope you enjoy the process of building it. I have dreamed about doing what you are doing, but never seem to have the funds with two kids in college.  Curious what materials will be on the exterior and roof, and also what you had in mind for lighting.  There is a group where I live in CT called the Northford Timber Framers. I believe they build one barn per year. I think it is sort of a class for some of the new members.  Northford is scattered with these beautiful barns. I'm looking forward to the pictures. I can fulfill my dream barn through you. (LOL) 

Best wishes and warm regards,

Mike Martino

Edited by Wheel Horse Story
  • Like 2

Share this post


Link to post
Share on other sites
 
DoctorHfuhruhurr

If you're ever considering putting in radiant floor heating then now is the time to consider putting the tubing down into the floor even if it's a project down the road.  LoopCAD has a free trial that I used to design all my loops and I was able to get it done before it expired.  http://www.avenir-online.com/AvenirWeb/LoopCAD/LoopCADHome.aspx   I plan on putting in an evacuated solar tube system to supplement my oil heating system.  

  • Like 1

Share this post


Link to post
Share on other sites
 
stevebo

Mike-

I sell standing standing seam roof system for a living so that is what I plan on installing (separate from the builder). The siding will be shiplap with stain. This barn will pretty much match exterior materials that my smaller one has. In terms of lighting I have been buying the old barn style ceramic hood lights. About 2 months ago I found 6 of them that are matching which I plan on installing in the main barn area. They will hang from the framing with metal pipe. I have another matching set that will go upstairs and also a gooseneck style one that will go over one of the doors. 

 

I just spoke to the concrete contractor today and we discussed laying out the radiant heat tubing. I do not plan on installing the radiant heat now but it may be something that I do down the line. I may even consider a solar panel system that circulates the fluid via a small pump through the floor. Not sure but I agree that now is the time to do it. I will load up a few more pics from this afternoon soon. I have a lot more digging to do for sure !!

Share this post


Link to post
Share on other sites
 

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now

  • Similar Content

    • Travas
      By Travas
      Hello everone reading this. Im currently in the process of building a race mower out of a front engine 8-32 toro. It was sitting outside for the longest time because of a broken axle. It believe it has a vertiical 8 hp b&s that had running. Here is some some photos of it.  I put a bifferent transaxle in because it was spare one laying around. I put it on and it fits pretty well. Altho i had to remove all the clutch and shifter parts to get it in, but hey it works. I got a wheel on and tried getting the other off the axle it was on. So i put it in the press and tried for about a half hour before in popped loose. After that it took me about 15 mins and got it off. It was really  rusted on there! Put it on the transaxle to how it fits and looks. Now im in the process of drilling a hole the axle for the key in the wheels. Any suggestions or ideas? I will update this project when do some more work on it. 









    • mmmmmdonuts
      By mmmmmdonuts
      I have approximately an 10x12 lean to shed attached to my house on the side of my side loading garage. I currently have a double door that is 6' wide by 6x10" high. The problem I am having is the door starting to fall apart. It is also framed very heavily with 2x6s. So I am currently looking to either do another double door or a garage door. Part of the reason the door is getting damaged in the first place is because water pools at the bottom of the door in the winter and freezes and I have to basically heat and or chisel the ice away. It is where I store my snowblower. 
       
      My wife ruled out a sliding barn door and a roll up door mainly for appearance purposes.
       
      I was starting to lean to a 8w x7h regular garage door but see a few cons. 
       
      1) It would block the light when up. 
      2) I would lose quite of bit overhead storage and about 2 feet of wall space.
      3) There would be much more work reframing parts of the wall to fit the door.
       
      Pros.
      1) I could fit my wheel horse plow and snowblower side by side. 
      2) Shouldn't freeze to the concrete as easily with a rubber seal. 
      3) Don't have to shovel out the doors to get the snowblower out. 
       
      I was wondering what thoughts you guys had on and if I am missing something.
       
      Thanks. 
       
    • CasualObserver
      By CasualObserver
      I've been dreaming of a new shop space to work on tractors and generally store things at my house. We already had a three car garage on the house and could only fit one vehicle in it due to the large space that kids toys, bikes, zero turn mower, shelving and a workbench already occupied. Well.. that stuff and a few or so little garden tractors... but they don't take up that much space, right?   Anyway...  we'd been talking about building my dream shop for several years. We live on a large in-town parcel, so there's plenty of room, but as with most things, it comes down to when it can fit in the budget. I drew it up several times on the building designer at Menards dreaming of when we could go forward. Well, in the early 2017 we decided to go ahead with it, and I came up with my final layout plan.

      We proceeded under the option of build the shell, and finish what we can later. We went over and over the list of things to do now and later. Things I wanted that had to be done now for sure were the rough in for the in-floor heat and the attic trusses. I had a contractor friend who would GC and frame it for me if I bought all the materials and he could do it on his own schedule. Yep, done. I figure I could have built it myself, but it would have taken most of the summer of every night and weekend, as well as the headaches of arranging the subs for the stuff I couldn't do, but if he could do it, and he has all the contacts/subs already... I'm money and time ahead to work some extra overtime and avoid the headaches.
       
      The previous owners of our place had a gravel RV parking next to the house. The old poorly done timber walls were deteriorating and leaning with age.It was convenient for parking the trailer, and nice when the kids were little that we could park off the driveway so they could play, but every year inevitably it was always a weedy mess by mid-summer.


       
       
      Step one, remove ugly timber wall.  Lucky for me my neighbor had an chainsaw with a garbage blade on it. He came over and we were able to cut the wall into 12 ft sections that we loaded on the trailer for the dump.


       
       
      Next, met with our contractor friend to stake and mark it out. Since part of the goal was to reduce the amount of gravel, the equivalence of one car parking space was being removed and returned to grass on the left edge.


       
       
      Then just before the excavator was to start work, the kids and I did a little groundbreaking for the big project.

       

      Some gravel removed and sand base laid down and compacted.



       
       
      Concrete guys laid the forms for me on a Friday night so I could lay the insulation and pex for the in-floor heat.


       
       
       Like any kids, the call of the sand pile was irresistible.


       
       
      Next day I had help to lay the insulation boards and pex. Might seem silly to see two people carrying these boards that weigh all of 2 lbs each... but notice all the pavers? I'd been hoping for good weather to do the insulation and pex..... what I got was great temperature, bright, sunny......and 25 mph sustained winds with 40-50 mph gusts. So.... two guys to carry each flippin' board and weight it down. Ugh.... made the process much longer.


       
       
      Got the pex down, which went very smoothly. Three zones, stapled to the foam board.


       
       
      Monday morning I get a call.... inspector won't pass it because there's no pressure test on the pex. Ugh. Nothing about that in our building code, but what am I going to do? Project can't go on without his initials. So... I build a pressure manifold, tie all three zones into one long line and charge it up.  Tues morning, concrete guys are onsite... inspector shows up and says ok.

       
       
      By the time I get home from work, I have a new slab.  


       
       
      Lumber pack shows up the day before the family and I are leaving for a week at the cabin. When I pulled out of driveway, construction was underway. We got a few progress pics through the weeks from various friends.


       
       
      And I returned a week later to this.  Totally the best way to build a shop!  I was out of his way, he was out of mine... worked out perfectly.


       
       
      I installed the overhead doors, had the electrician come and trench the electric over. Got the gas line roughed in for the boiler as well while the trench was open.





       
       
      After that, the excavator came back with the final top dress for final grading.  



       
       
      We bit the bullet and decided to go with sod right away. Even got the kids to help for a little while. Couple of neighbors (one of whom happens to be a professional landscaper) came over the chip in too, and three pallets later....



       
       
      Now we're at slow progress time. I bought all the construction materials on a Menards 11% rebate, so once I got the rebate check I started to finish the interior. Got the vapor barrier up, and ceiling rocked with 12 foot 5/8" type x. 105 lbs each. Ugh. Thank God for drywall lifts, right!?


       
       
      More rebate checks allowed for the insulation and rock for the walls.



       
       
      Then we came to a complete standstill..... got enough stuff moved out of the house garage to get both the car and truck in for the winter, but with no heat and no ceiling insulation the shop was just a big storage box for winter.

       
       
      Spring this year rolled around and prioritizing shop work made it to the list. I realized it's going to be much easier to get the interior done before I move in. So... started back at it. I got the floors masked off and got tape and mud done... then the girls helped me paint.





       
       
      Did the floor with Rock Solid polycuramine kits from Menards... grey with flakes and a textured topcoat to make it less slippery if wet. This is a long and multi-stage process. First it required renting a diamond grinder and grinding off the curing sealer. Then powerwashing three times to remove all dust and debris.  The base coat went on, cured for a few days, and topcoated three days later. Then I let that cure for a week before moving in. It's supposed to be cured in 24 hours, but why rush it if not necessary?




       
       
      Finally ready to move in.


       
       
      Got some used kitchen cabinet take outs and installed them for the workshop area.




       
       
      Really looking forward to getting stuff organized and cleaned up now.  It's totally a dream come true. Still have to buy and install the boiler and get the ceiling insulated... but those are things that can be worked around. Up until this point it's been much easier to have minimal stuff in the way.
       
      If you made it all the way to the bottom, thanks for taking the time to read it.  Get more done, have more fun!!   
       
       
       
    • Pullstart
      By Pullstart
      Pretty soon, the tractors will have a place for everything and everything in it’s place!
       
      We put up another section of racking and it will allow for some custom pallets at 66” long and 44” wide to store tractors 3-wide in the racking.  The closest green upright is 9’ tall, it’ll be a shell for the buggy to rest on top of 


×
×